Does anyone have the same problem that I'm having?
Its been 2 days that the Dash Core is saying "4 weeks behind" and can't process blocks.
I'm using Dash Core version v0.11.2.23-g9646c5f-beta (32-bit)
Is there anything to do?
Thanks.
My .bat file:
Code:
minerd-corei7-avx.exe -a X11 -o stratum+tcp://us-east.multipool.us:3371 -u XXX.X -p X -t 1
When I start the .bat file it stop work and gives me an alert window to close the program.